Stallions Empire Private Limited is coming up with Bulk Drugs Manufacturing Unit Project at Ankleshwar, Bharuch, Gujarat.
Cost of the project is 4.15 Crores.
Type of Unit New- Green Field.
Total Plot Area 1539.87 Sq. m.
Green Belt Total 508.87 Sq. m. (Approx 33 % of total plot area) within Plant premises.
Flue Gas Emission No. 1 Boiler 1 TPH No. 1 DG Set 125 KVA (Stand by).
Land Filling M/S. Bharuch Enviro Infrastructure Ltd.
Permission Land Filling Waste: 500 MT/Year Co-Process
Permission Co-Process Waste: 700 MT/Year.