The National Highways Authority of India (NHAI) has invited bids for the construction of greenfield corridor from Suara (Sasaram) at ch 0.000 to Garhani (at SH-12) at ch 74.432 km on NH-119A.
The cost of the project is estimated at Rs 1,143.36 crore, under Package-I of Patna-Arrah-Sasaram Expressway of NH-119A in Bihar.
The final date of bid submission is 20th September, 2023.