Current Date: 22 Nov, 2024

Narmada Water Resources plans to set up barrage in Gujarat

The Narmada Water Resources, Water Supply & Kalpsar Department (NWRWS&KD) is currently constructing a barrage across the Narmada River near Bhadbhut village in Bharuch district of Gujarat.

Project Overview

Location: Bhadbhut village, Bharuch district, Gujarat
Project cost: ₹4,245.19 crore (approximately US$530 million)
Completion time: 48 months
Construction start date: August 7, 2020
Expected completion date: December 2024
Contractor: Joint venture of Dilip Buildcon and HCC
Project Objectives

Irrigation: Provide irrigation water to over 1.76 lakh hectares of land in Bharuch, Narmada, and Anand districts.
Drinking water: Provide drinking water to over 40 lakh people in Bharuch and Narmada districts.
Flood control: Protect the surrounding areas from floods.
Hydropower generation: Generate 25 MW of hydropower.
Project Components

Barrage: A 2.4 km long and 23.6 m high barrage across the Narmada River.
Canal: A 30 km long canal to transfer water from the barrage to the Kalpasar dam.
Flood protection embankments: 53 km of embankments to protect the surrounding areas from floods.
Powerhouse: A 25 MW hydropower generation plant.
Current Status (as of October 2023)

Construction of the barrage foundation is nearing completion.
Work on the canal and flood protection embankments is ongoing.
Construction of the powerhouse is yet to begin.

News by Rahul Yelligetti