SRM Contractors Limited has secured contracts valued at ₹168 crore for infrastructure works in Himachal Pradesh.
The project involves implementing long-term remedial measures at a landslide-prone stretch in Thalout, between chainage 229+600 and 230+100 on the Pandoh–Kullu section of National Highway 03 (old NH-21). It will be executed under the National Highways (Original) scheme on an EPC (Engineering, Procurement and Construction) basis.
The scope includes slope stabilisation and associated construction activities to mitigate landslide risks, enhancing the safety and reliability of this critical highway corridor.
This order strengthens SRM Contractors’ footprint in executing complex highway and infrastructure projects in geologically challenging regions.
News by Rahul Yelligetti.