Vasundhra Homes Private Limited intends to construct a new residential-commingled with commercial complex in Argora, Ranchi, Jharkhand. The completion of the Vasundhra Argora project is anticipated in 2025.The project, which will encompass 3,51 acres (14,220.33 sq m) of land, will include the following:The G+2 Floor of the Community Hall20 stores and 15 offices are located on the LG+G+5 floor of the Commercial Block A (Vasundhara Elegance) on the fifth floor.Residential Block B (Vasundhara Megamart) - LG+G+10 with 80 apartmentsBlock C (Vasundhara Radiance) - LG+G+14 floors with 112 apartments.In addition, there is a playground, an internal road, a water supply system, rainwater harvesting, and parking for 112 vehicles.On a 10-acre plot of land, 600 apartments ranging from 2 BHK to 3 BHK will be constructed as part of this development.
The residences will feature modern amenities such as a swimming pool, fitness center, and children's play area. Also anticipated are a number of environmentally friendly features, such as rainwater collection and solar panels.The Vasundhra Argora project is situated in a prime location in the Ranchi suburb of Argora, which is experiencing accelerated growth. The area is well-served by schools, hospitals, and other amenities and is well-connected to the city via road and rail networks. It is anticipated that the project will be in high demand due to its location and amenities.Vasundhra Homes Private Limited is a reputable Jharkhand-based real estate developer with a history of delivering projects on schedule and within budget.
The corporation is certain that the Vasundhra Argora project will be successful and will contribute to the expansion of the Argora region.Listed below are specifics about the Vasundhra Argora project:Argora is in Ranchi, Jharkhand.The total land area is 10 acres.The number of units is 600Sizes range from 2 BHK to 3 BHK.Swimming pool, fitness center, children's play area, rainwater filtration, and solar panels are provided as amenities.The estimated completion date is 2025
As of September 2023, The project is in the final stages of completion work on the project is finished between 75% & 80% of the time the work on the project will be finished by 2023 or 2024.
News by Rahul Yeligetti