Western Railway plans to build a dedicated Vande Bharat coaching and maintenance depot on roughly 55,000 sq. mtrs. at Lower Parel (Currey Road) in Mumbai at an estimated cost of ₹98 crore. The site is currently used by Central Railway's Store Depot, which will move to Thakurli so construction can proceed. Execution is planned in two phases—₹49 crore has been sanctioned for Phase I, while Phase II is awaiting approval.
The depot will include two full-length pit lines and six stabling lines alongside facilities for train maintenance and parking, linking to Dadar and Mumbai Central via existing and upcoming sixth-line infrastructure. Once operational, it will also allow Dadar to originate primary-maintained trains, giving Western Railway more operational room to expand long-distance services out of Mumbai.
News by Rahul Yelligetti.