Current Date: 08 Jul, 2024

Six-Laning the Kodungallur-Edapally Stretch A Boost for Kerala's Infrastructure

The Kodungallur-Edapally Six Laning Road Upgradation Project, valued at an impressive 1617.2 Crores, is set to bring about a transformative change to the NH-66 (Old NH-17) stretch between Kodungallur and Edapally in Thrissur, Kerala. With a planned length of 26.030 kilometers, the project focuses on upgrading the existing four-lane highway to six lanes, connecting key towns and cities in Thrissur and surrounding districts.

This project boasts several key features aimed at enhancing efficiency and safety. The expansion to six lanes aims to reduce congestion and travel times, while modern design and safety amenities prioritize the well-being of both motorists and pedestrians. Additionally, the improved connectivity is expected to boost trade and tourism, stimulating economic growth in the region. The undertaking, already in progress since March 2022, holds the potential to generate jobs, stimulate local businesses, and contribute significantly to overall economic development.

While specific details about the completion date and progress of different sections are not immediately available, the Kodungallur-Edapally Six Laning Road Upgradation Project is poised to be a game-changer for the people of Kerala. By facilitating faster travel, improving safety, and fostering economic growth, this ambitious infrastructure initiative promises to shape the future of regional connectivity and development.

For updates on the project's progress, interested individuals can check the National Highways Authority of India (NHAI) or Oriental Structural Engineers Limited websites. Additionally, monitoring news and announcements from the Kerala government and local media outlets can provide further insights into the project's timeline and its impact on the region.

As on January, 2024. Project building has begun. 65% of the project is done. The project will finish in December 2024.

News by Rahul Yelligetti

Source : Projxnews