The Water Resources Department, Odisha has invited bids for the appointment of a Proof Engineering Consultant (PEC) for the construction of a distribution system covering 5,177.98 hectares of command area (CCA).
The project includes the Command Area Development (CAD) of the Salandi Left Main Canal, from RD 59.970 km to 60.304 km, using an underground pipeline irrigation system. The work is scheduled to be completed within 24 months and aims to enhance irrigation infrastructure and ensure more efficient water distribution across the designated areas.
The bid submission deadline is 29 December 2025.
News by Rahul Yelligetti.